Hold the bar up to the shower wall lined up to the support holes on the top of panel a.
Manual ro installation of a shower glass door.
4 lay a bead of silicone on the bottom of the track.
Video and pdf installation manual for bent glass frameless mirror coffee table teardrop side table and all type of glass shelf and mirrors.
Please fill the following to get notify.
The left hand door installation is shown as an example throughout this manual.
Tip 1 25 4mm minimum at threshold 0 0 0 0 1 max 1 minimum threshold.
3 drill holes for the tracks and jambs.
For the right hand door installation flip the assembly from top to bottom so that the panel is on the right side.
Install the bypass bar.
Basco is a leading manufacturer of glass shower doors and enclosures sliding shower doors custom shower doors and frameless glass shower enclosures.
Position the fixed panel and structural rail assembly in the shower door opening.
Place seal strip 12 to the fixed panel from the side of the wall.
This bar is a guide track for the sliding door.
How to install a sliding glass shower door.
Inside door glass outside door glass.
Screw the structural rail 11 to the fixed panel 4 with the fixed panel holders 2.
By filling the form below you will get an email or may be contacted via phone when the item is available for purchase.
2 cut the tracks to length.
Follow these eight steps to properly install a sliding glass shower door.
1 measure the top and bottom track areas.
Inside shower and screw into place using 2 m5x35 flathead screws 15.
Clear plastic cushion 13 between the base mount and shower wall keeping the nished chrome plated edge of base facing.
Use a 1 thick wood block or shim to hold up one end of the top guide rail 02 no more than 1 above thewall profiles 01 to allow enough space to install the doors.
If it doesn t fit perfectly you need to take down the shower doors and adjust the rollers until a guide slides in.
Fixate the guide in the middle of the bottom rail from the inside.
Mark the holes located in the glass panel onto the bar with a permanent marker.
Remove connector base mounts 12 a b from wall connectors 11 place a.
Repeat procedure 1a 1d for mounting connector.
However the actual installation of your new shower door can be completed by our professional installers in 2 3 hours.
Make sure to cut the rail on the shower door side only.
Our shower doors are customized for your space so having a new one ordered fabricated and delivered could take up to 3 weeks.
You should use a drill and suitable stainless screw from the set.
This door is reversible for right or left hand door installation.