In a wall which will be covered with wall paper the panel surface does not need to be as smooth as when the wall is to be painted eilola reminds us.
Method statement for wall panel installation.
Install panels in such a manner that panel joints do not align with edge of opening.
Procedure and safe work method statement for installation of wall padding panels.
This method statement is written for the purpose of establishing method and procedures for the installation of db smdb and mdb panelboards.
Installation sequence as per method statement.
This procedure shall be read in conjunction with contract specification where applicable.
For vertical board installation start centre.
The surface finishing material used is a thin skim coating.
Switchboard distribution panels and mccs.
Below is only step wise procedure and complete method statement will have all sections like scope references responsibilities itp checklists and risk assessments.
The method of panel finishing will affect how the panel surfaces are to be processed.
This method statement covers the detailed procedure to be followed for supply installation of wall panels as per approved shop drawings and schedule of finishes for the project.
The first panel sets the direction and flow for the rest of the panels so it is imperative that the panel be straight and parallel to the floor.
Tightly butt tapered end board edge joints.
1 1 the installer shall supply and install the gypsum calcium silicate board in accordance with specification as shown on the drawings.
Leave panels in the room where you plan to install them between 48 and 72 hours prior to installation to acclimate panels to the room s temperature and humidity level.
Low voltage room and electrical rooms.
Place panels flatly on their length of 2 438 m 8 feet against the wall in way to allow air circulation between panels.
Your walls must be leveled as much as possible.
Download method statement for wall panels installation download package contains the method statement checklists for installation inspection testing plan risk assessment you only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant clients.
Gently remove any crown moulding baseboards and trim you plan on using again.
Technical data test certificates installation instructions and valid bomba s certificates for fire rated assemblies for approval prior to commencement of work will be provided by manufacturer.
Panels should be installed from the bottom up with panel adhesive applied to the wall and screws firmly attaching the panel to the wall.
For multi layered boards stagger joints between the layers as well as on opposite sides of partitions.
The purpose of this procedure is to define how the wall panels fabrication and installation shall be carried out under the controlled condition.
Method statement for drywall work.